Construction Bulletin November 5–9

The main con­struc­tion activ­i­ties for the week of Novem­ber 5– 9 are the following:

-  Fram­ing of  sof­fits on the 3rd floor out­side of the con­struc­tion bar­rier. Increased noise level for cut­ting and fas­ten­ing of mate­ri­als.  Work hours will be from 5:00 am to 1:30 pm.
–  Ongo­ing mechan­i­cal and elec­tri­cal sys­tem rough-in and instal­la­tion on the 1st floor and mez­za­nine. Nor­mal con­struc­tion noise lev­els.
 -   Floor 3 sof­fit mechan­i­cal and elec­tri­cal rough-in out­side of con­struc­tion bar­rier. Work hours will be from 5:00 to 1:30 pm.
–  Instal­la­tion of glass wall sys­tem header track on 3rd floor sof­fits to allow dry­wall instal­la­tion. Work hours will be from 5:00 to 1:30 pm.
–  Plumb­ing sys­tem mod­i­fi­ca­tions on the Fri­day night and Sat­ur­day morn­ing when library closed.

The fol­low­ing con­struc­tion activ­i­ties will be start­ing next week of Novem­ber 12 — Novem­ber 16.

 - Ongo­ing mechan­i­cal and elec­tri­cal sys­tem rough-in and instal­la­tion on the 1st floor and mez­za­nine. Nor­mal con­struc­tion noise lev­els.
–  Floor 3 sof­fit mechan­i­cal and elec­tri­cal rough-in out­side of con­struc­tion bar­rier. Work hours will be from 5:00 to 1:30 pm.
– Stock­ing of dry­wall and instal­la­tion of dry­wall at sof­fits on 3rd floor both inside and out­side of bar­rier. Increased noise level for screw guns, etc. Work hours will be from 5:00 am to 1:30 pm.
 - Com­ple­tion of fram­ing of floor 3 sof­fits out­side of the con­struc­tion bar­rier. Increased noise level for cut­ting and fas­ten­ing of mate­ri­als.  Work hours will be from 5:00 am to 1:30 pm.